Discover our steel frame medical training center project!
Discover our steel frame medical training center project!
What: Medical training center
Location: French Guiana
Partners: beSteel, WK Conseil, WK Invest, ASD Trading LTD, GUIMABAT
Client: WK Conseil / GUIMABAT
Status: The project is finished
Project:
Compact logistics:
FlatPacked delivery reduced container volume, ideal for remote regions
Optimized speed:
Two weeks to panelize, two weeks to build, minimal disruption, maximum efficiency
Environmentally responsible:
Prefabrication reduced material waste and overall carbon footprint
The Lemki project is built for a medical training center in French Guiana, the structure was designed using beSteel’s FlatPacked system, allowing all components to be shipped in compact form and assembled on-site with minimal infrastructure. The prefabricated steel profiles were assembled into panels in just two weeks, followed by a two-week on-site installation covering all three floors. Despite the remote location, the project was executed with speed, precision, and sustainability in mind, demonstrating the full potential of steel frame construction in constrained environments.
Built for remote access, speed, and performance.
Learn more about our FlatPacked solution here.
Our FlatPacked steel system is made for challenging locations, fast to ship, fast to build, and strong for the long term.